Electrical Testing | Electrical rewiring | Framework | ProcurePublic

Electrical Services Framework

Electrical Services Framework
  • Contract Notice

    2020/S 224-551996

  • Award Notice

    2020/S 251-634326

  • CPV Code

    31600000 Electrical equipment and apparatus
    39710000 Electrical domestic appliances
    45310000 Electrical installation work
    45311000 Electrical wiring and fitting work
    45311100 Electrical wiring work
    45311200 Electrical fitting work
    45315000 Electrical installation work of heating and other electrical building-equipment 45317000 Other electrical installation work
    51100000 Installation services of electrical and mechanical equipment
    71314100 Electrical services

  • NUTS Code

    UK

  • Duration

    4 years - Up to £75,000,000.00

  • Expiry Date

    January 2025

  • Direct Selection

    Yes

  • Mini Competition

    Yes - 60% Quality / 40% Cost (10% +/- allowance)

  • Contract Type

    Framework terms and conditions- JCT, TPC or bespoke T&C's

  • Cost Model

    Schedule of Rates

  • Access Fee

    Nil

Summary

An all-encompassing Electrical Testing and Installation Framework. EICR (C1 & C2 repairs).

The services include; Inspect and report on the condition of the under noted items in accordance with the 18th Edition of I.E.E. Regulations for Electrical Installation including but not limited to:-

1. Visual inspection.
2. Continuity of ring final circuit conductors.
3. Continuity of protective conductors, main and supplementary bonding.
4. Earth electrode resistance.
5. Insulation resistance.
6. Protection by electrical separation.
7. Insulation of non-conducting floors and walls.
8. Polarity.
9. Earth fault loop impedance.
10. Operation of residual current operated devices and fault – voltage operated devices.
11. Any other matters required.
12. Production of certification in an agreed format.

Next Steps

How to use this Framework?

Our simple step process allows for both Direct Selection or Mini-Competition. Further information can be found below. Please note that Clients may enter into a contract for any duration that best allows for the performance of the requirement to be achieved.

  • Direct selection

    With the direct selection method, you may select the Contractor who is ranked number 1, or any other Contractor/ Consultant on the following basis:

    • Where you have an existing relationship with the Contractor/ Consultant.
    • Where the Call Off has substantial similarities to a previous project the Contractor/ Consultant was involved with. (under this Framework Agreement or not)
    • For reasons of urgency, it is not reasonably practicable to award the Call-Off Contract by way of a Mini-Competition.
    • Capability Criteria determining that only one framework appointee is capable of carrying out the Call-Off Contract.
    • Where the Client is able to determine which Contractor/Consultant will provide it with the most economically advantageous offer.
    • Where the Contractor/Consultant has introduced the site.

    To proceed with a Direct Selection please click on the tab below

  • Mini competition

    Our Mini-Competition process lets you expand beyond the framework’s original specification to meet your specific requirements. The framework partners from the relevant lot are invited to tender (where capable). This process typically takes 2-4 weeks. The capability criteria can be defined by the following:

    • The Contractor’s capability to carry out a project of the size and complexity of the proposed project;’
    • The Contractor’s capability to carry out works and services in the locality of the proposed project;
    • The Contractor’s capability to carry out projects involving the type of construction that the proposed project involves
    • The Contractor’s financial stability and standing;
    • The insurances held by the Contractor;
    • The Contractor’s health and safety record;The Contractor’s capacity, taking into account the value of Works and Services already awarded to it under the Framework Agreement;
    • The volume of work (as a percentage of its total turnover) that the Contractor is currently carrying out for the Authorised User in question;
    • The Contractor’s performance against KPIs on current or previous Call Off Contracts awarded to it under the Framework Agreement;
    • The Contractor’s willingness to work at risk on the project (as may be evidenced by examples of previous occasions where it has done so);

To proceed with a Mini Competition please click on the Mini Competition Tab below,

Call-off Forms (E-Sign)

ProcurePublic has simplified the call-off process to 4 steps allowing you access to our framework within minutes. The 4 steps include E-sign and details (or guidance) can be found below; alternatively, you can choose mini-competition.

Direct Selection

This step will allow your organisation to Direct Select an Appointee from the Framework. The E-Sign Form contains the joining agreement and contract. The form allows for schedules, amendments and requirements to be inserted. For audit purposes Procure Public will need to retain a copy of the form in order for the contract to be effective.