Terms and Conditions (Website Terms of Use)
Last updated: 12 February 2026
These Terms and Conditions (“Terms”) apply to your use of procurepublic.co.uk (the “Website”). By accessing or using the Website, you agree to these Terms. If you do not agree, you must not use the Website.
1) Who we are
This Website is operated by ProcurePublic Limited (“we”, “us”, “our”).
-
Registered office: International House, 36–38 Cornhill, London, EC3V 3NG, United Kingdom (Companies House)
-
Company number: 09714989 (as shown on Companies House) (Companies House)
-
Email: support@procurepublic.co.uk
-
Telephone: 0333 050 3192 (ProcurePublic)
2) Other terms that may apply
These Terms should be read alongside:
-
our Privacy Policy; and
-
our Cookies Policy.
Where you engage with us in relation to a framework, tender, call-off, mini-competition, supplier registration, or other procurement activity, additional terms may apply (for example, framework agreements, ITTs, schedules, portal terms, or joining agreements). If there is any conflict, the procurement-specific documents will usually take precedence for that activity.
3) Changes to these Terms and the Website
We may update these Terms from time to time. The “Last updated” date above shows when changes were most recently made. Your continued use of the Website means you accept the updated Terms.
We may also update, suspend, withdraw, or restrict access to all or part of the Website without notice.
4) Using our Website
You agree that you will not:
-
misuse the Website (including by introducing viruses, malware, or other harmful material);
-
attempt unauthorised access to the Website, servers, or connected databases; or
-
use the Website in any way that breaches applicable laws or regulations.
You are responsible for ensuring anyone who accesses the Website via your internet connection is aware of these Terms and complies with them.
5) Intellectual property
Unless stated otherwise, we own (or license) all intellectual property rights in the Website and its content (including text, graphics, branding, and layout).
You may print or download extracts for personal or internal business use only, provided you do not modify them and you keep any copyright notices intact.
You must not use our branding or content for commercial purposes without our written permission.
6) Information on this Website
The Website is provided for general information only. While we make reasonable efforts to keep content up to date, we do not guarantee it is accurate, complete, or current. (ProcurePublic)
Nothing on the Website constitutes legal, procurement, financial, or professional advice. You should obtain professional advice before taking (or not taking) any action based on Website content.
7) Procurement and framework-specific disclaimers
Where the Website references frameworks, services, supplier opportunities, or procurement processes:
-
availability, scope, timelines, and requirements may change and will be confirmed in the relevant procurement documents and/or portal notices;
-
the Website does not create any obligation to award a contract or place work with any supplier; and
-
participation in any procurement process is at your own cost and risk, unless the relevant documents state otherwise.
Where we act as a managing agent for a contracting authority, that authority’s procurement documents and decisions govern the procurement.
8) Links to third-party websites
The Website may include links to third-party sites and resources. These are provided for convenience only. We do not control third-party sites and are not responsible for their content, availability, or any loss arising from your use of them.
9) Uploads, forms, and submissions
If the Website allows you to submit information (for example, via contact forms, registration steps, or document uploads), you confirm that:
-
the information you provide is accurate and not misleading; and
-
you have the right to provide it.
We may reject, remove, or disable access to any submission where we reasonably consider it unlawful, harmful, or in breach of these Terms.
10) Our liability
Nothing in these Terms excludes or limits liability where it would be unlawful to do so, including liability for death or personal injury caused by negligence, fraud, or fraudulent misrepresentation.
Subject to that, and to the maximum extent permitted by law:
-
we exclude all implied conditions, warranties, or representations that may apply to the Website; and
-
we are not liable for any loss or damage arising from your use of (or inability to use) the Website, including indirect or consequential loss, loss of profits, loss of business, loss of goodwill, or loss of data.
We do not guarantee that the Website will be secure, error-free, or always available.
11) Viruses and security
We do not guarantee the Website will be secure or free from bugs or viruses. You are responsible for using appropriate security software and configuration for your device(s).
12) Governing law and jurisdiction
These Terms are governed by the laws of England and Wales. The courts of England and Wales shall have exclusive jurisdiction over any dispute arising out of or in connection with these Terms or the Website.
13) Contact
To contact us about the Website or these Terms:
support@procurepublic.co.uk / 0333 050 3192 (ProcurePublic)-
Anti-Bribery & Corruption Policy
Organisations: ProcurePublic Limited and National Framework Partnership Limited
Effective date: 01/01/2026
Review date: annually and after any serious incident1) Policy statement
The Organisations operate with zero tolerance of bribery and corruption in any form. We are committed to acting lawfully, fairly, transparently, and with integrity, particularly when supporting and operating public sector procurement activities including the establishment, award, and management of framework agreements, DPS arrangements, and call-off processes (including mini-competitions).
Bribery and corruption undermine public trust, distort competition, and may expose the Organisations, our people, and suppliers to criminal, civil, regulatory, and reputational consequences. We will take proportionate steps to prevent, detect, and respond to bribery and corruption risks in our business and in the services we deliver to Contracting Authorities.
2) Scope
This policy applies to:
-
all directors, employees, agency staff, consultants, secondees, and anyone acting for or on behalf of the Organisations;
-
all interactions with current or prospective suppliers, bidders, framework participants, subcontractors, agents, and intermediaries;
-
all procurement and commercial lifecycle activities we support or administer, including:
-
pre-market engagement and pipeline activity;
-
tender set-up, publication and clarifications;
-
evaluation administration, moderation support, and award documentation;
-
framework onboarding, supplier relationship management, and performance monitoring;
-
call-off processes and mini-competitions (where we support or administer);
-
contract administration support, variations, extensions, and dispute handling.
-
This policy must be read alongside:
-
Conflicts of Interest Policy and Registers
-
Gifts & Hospitality Policy / Register
-
Whistleblowing Policy
-
Counter-Fraud Strategy (where adopted)
-
Data protection policies (as relevant to procurement records)
3) Legal and regulatory framework (UK)
This policy supports compliance with (among others):
-
Bribery Act 2010 – offences of bribing another person, being bribed, bribing a foreign public official, and corporate “failure to prevent bribery”.
-
Public Contracts Regulations 2015 (PCR 2015) – supplier exclusion grounds for certain convictions (including bribery/corruption-related offences) and principles of equal treatment and transparency in regulated procurements.
-
Procurement Act 2023 (PA 2023) – exclusion grounds and debarment regime (where applicable), plus transparency and integrity expectations in covered procurements.
-
Proceeds of Crime Act 2002 – money laundering and handling criminal property offences (relevant where suspicious financial activity is identified).
-
Fraud Act 2006 – fraud by false representation, failing to disclose information, or abuse of position (relevant to procurement and contract administration).
Note: Where we act as managing agent/framework provider, the Contracting Authority remains responsible for its statutory procurement duties. However, we will design and run our processes to support compliance and protect integrity across the framework lifecycle.
4) Definitions (plain English)
-
Bribe: Anything of value offered, promised, given, requested or received to improperly influence a decision or action.
-
Improper performance: A breach of trust, impartiality, or duty (including duties relating to public procurement).
-
Facilitation payment: A payment to “speed up” routine actions (always prohibited).
-
Kickback: A secret commission/benefit linked to awarding work, scoring, approvals, or payments.
-
Associated person: Anyone performing services for or on behalf of the Organisations (employee, consultant, agent, etc.).
5) What is prohibited
You must never (directly or indirectly):
-
Offer, promise, give, request or accept a bribe.
-
Make or accept facilitation payments.
-
Offer or accept kickbacks, secret commissions, or undeclared benefits.
-
Use gifts, hospitality, travel, discounts, loans, donations, sponsorship, employment opportunities, or any advantage to influence (or appear to influence) any decision relating to frameworks, supplier status, evaluations, call-offs, or contract management.
-
Manipulate procurement outcomes, including:
-
leaking information or “inside” guidance;
-
tailoring requirements to favour a supplier without proper authority direction and documented rationale;
-
biased scoring or moderation;
-
suppressing legitimate challenges/clarifications;
-
bypassing governance or audit trails.
-
-
Retaliate against anyone who reports concerns in good faith.
6) Roles and responsibilities
All staff/representatives must:
-
comply with this policy and complete required training;
-
avoid conflicts of interest and declare them promptly;
-
declare/record gifts and hospitality;
-
raise concerns immediately.
Directors / Senior Leadership must:
-
set a “tone from the top” and ensure resources, training, and enforcement;
-
appoint a policy owner and ensure periodic risk reviews.
Commercial/Procurement Leads must:
-
embed anti-bribery controls in framework and call-off processes;
-
ensure clear audit trails for key decisions;
-
ensure supplier onboarding includes proportionate integrity checks and appropriate contractual clauses.
Finance/Operations must:
-
ensure robust controls around invoicing, rebates/fees, approvals, and segregation of duties.
7) Bribery risk assessment (framework-focused)
We will maintain a documented bribery risk assessment at least annually and when material changes occur, considering:
-
high-value/high-volume frameworks and vulnerable categories (works, FM, compliance services, consultancy, IT);
-
supplier concentration and “incumbency” pressures;
-
use of agents, introducers, or intermediaries;
-
contract variations/extensions and any “urgent” routes;
-
incentives/fees/rebates and payment flows;
-
staff exposure to supplier contact (events, meetings, site visits).
8) Gifts, hospitality, events and conferences
Principle: Gifts/hospitality must never influence (or appear to influence) a decision.
Minimum rules:
-
No cash or cash equivalents (gift cards, vouchers, crypto, personal discounts outside normal market offers).
-
No gifts/hospitality from bidders/suppliers during any live tender, evaluation, moderation, standstill, onboarding, or live mini-competition relating to that supplier (unless refusal would cause offence and value is genuinely nominal—must be declared immediately).
-
All gifts/hospitality above £[x] require prior written approval from [role].
-
All gifts/hospitality (accepted or refused) must be recorded in the Gifts & Hospitality Register within [48] hours.
-
Attendance at supplier-sponsored events must be pre-approved and demonstrably for legitimate business purposes.
9) Conflicts of interest
Conflicts (actual, potential, or perceived) must be declared and managed.
Required declarations:
-
directors and all staff involved in procurement/framework administration;
-
anyone attending bidder meetings/market engagement;
-
evaluators and moderators (where we administer or support evaluation activity);
-
anyone involved in onboarding, performance management, or contract administration.
Mitigations may include:
-
recusal from activity, removal of system access, independent oversight, rotation of staff, or additional approvals.
10) Procurement and framework integrity controls
The following controls are mandatory across all framework and procurement support activity:
A. Segregation of duties
-
No single person should control requirement definition, supplier communications, evaluation administration, award documentation, and financial approvals.
B. Controlled communications
-
Supplier communications must be routed through approved channels (e-tender portal, designated mailbox, logged calls/meetings).
-
No informal “off-record” guidance.
C. Records and audit trail
Maintain complete records including:-
approvals, conflict declarations, clarifications, evaluation logs (where applicable), moderation notes, award rationale, acceptance/onboarding correspondence, and any call-off support documentation.
D. Supplier onboarding / due diligence (proportionate)
Risk-based checks may include:-
identity and company status;
-
beneficial ownership/controls where relevant;
-
red flags (e.g., adverse media, integrity concerns);
-
confirmation of anti-bribery controls and subcontractor flow-downs.
E. Exclusion and integrity escalation
Where we become aware of credible bribery/corruption concerns regarding a supplier:-
we will escalate to the relevant Contracting Authority promptly;
-
we will preserve evidence and records;
-
we will support lawful steps consistent with the applicable procurement regime (PCR 2015 or PA 2023), including consideration of exclusion/debarment consequences where relevant.
F. Fees, rebates and financial interactions
-
Any supplier fee/rebate mechanism must be contractual, transparent, invoiced, and auditable.
-
No “side agreements”, personal payments, or undisclosed benefits.
11) Third parties, agents and intermediaries
Where the Organisations use or interact with introducers, agents, consultants, or subcontractors:
-
we will conduct proportionate due diligence before engagement;
-
contracts must include anti-bribery obligations, audit rights (where appropriate), and termination rights for integrity breaches;
-
commission structures must be transparent and not create improper incentives.
12) Speaking up and reporting concerns
You must report immediately if you:
-
are offered a bribe or suspect bribery/corruption;
-
observe unusual supplier behaviour (pressure, “favours”, lavish hospitality, attempts to bypass process);
-
suspect manipulation of tendering, scoring, onboarding, call-off processes, or payments.
Report via:
-
Line manager / Director: [name/role]
-
Compliance Lead: [name/role/email]
-
Confidential whistleblowing route: [hotline/email/portal]
We will not tolerate retaliation against anyone raising a concern in good faith.
13) Investigation and response
All allegations will be handled promptly and confidentially. Actions may include:
-
securing evidence and audit trails;
-
suspending access to systems or removing individuals from the activity;
-
notifying relevant Contracting Authorities where the matter touches a procurement/framework;
-
obtaining legal advice and reporting to law enforcement/regulators where appropriate;
-
contractual remedies (termination, recovery) and internal disciplinary action.
14) Training and awareness
-
Mandatory induction training for all staff.
-
Enhanced training for procurement/framework administration, supplier management, and finance approvals.
-
Annual refresher and targeted briefings for higher-risk frameworks.
15) Monitoring and review
We will:
-
monitor compliance through periodic sample checks of procurement and framework files;
-
review gifts/hospitality and conflict registers;
-
track incidents, outcomes, and lessons learned;
-
update this policy at least annually and after major regulatory change.
16) Breaches and sanctions
Breaches may result in disciplinary action (including dismissal), termination of engagement, supplier escalation to Contracting Authorities, civil recovery, and/or referral for criminal investigation.
-
Conflicts of Interest Policy
for ProcurePublic Limited and National Framework Partnership Limited
Last updated: 12 February 2026
1. Purpose
This Policy sets out how we identify, prevent, manage and (where necessary) remove conflicts of interest arising from our role as a managing agent / framework provider supporting public sector procurement and contract management. It is designed to protect:
-
the integrity and lawfulness of procurement processes,
-
fair and equal treatment of suppliers,
-
robust governance and public trust, and
-
our staff, directors and associates from improper influence.
2. Scope
This Policy applies to:
-
all directors, officers, employees, consultants, agency staff and secondees (“Personnel”);
-
any person acting on our behalf (including panel members, evaluators, moderators, technical advisers);
-
conflicts arising in relation to any procurement activity, including: market engagement, drafting documents, selection/shortlisting, evaluation, moderation, award, standstill, framework on-boarding, call-offs/mini-competitions, contract variations and performance management.
This Policy applies across both companies where they support the same procurement, client, supplier cohort or contract.
3. Definition of a conflict of interest
A conflict of interest exists where a person’s private interests (financial or non-financial) could improperly influence (or be seen to influence) the impartial performance of their duties.
Conflicts may be:
-
Actual: currently influencing decision-making.
-
Potential: could arise in the future.
-
Perceived: a reasonable observer could think impartiality is compromised (even if it is not).
3.1 Common examples in our context
-
A director or staff member (or close family member) has a role, shareholding, employment, consultancy or other financial interest in a bidding supplier.
-
Prior involvement in preparing a supplier’s bid (or advising them) and then participating in evaluation or moderation.
-
Gifts, hospitality, incentives or preferential treatment offered by a supplier.
-
“Revolving door” issues (recent employment by a supplier or client, or negotiating future employment).
-
Use or disclosure of confidential supplier information, pricing, or evaluation content.
-
Personal relationships (family, partner, close friend) with supplier/client staff involved in the process.
-
Acting for competing suppliers or a supplier and the contracting authority in a way that creates unfair advantage.
4. Policy principles
We will:
-
Act impartially and avoid bias.
-
Treat suppliers equally and not create unfair advantage.
-
Be transparent: declare and document conflicts promptly.
-
Use proportionate controls: remove/recuse where appropriate.
-
Maintain confidentiality and information security at all stages.
-
Keep a clear audit trail that the contracting authority can rely on.
5. Roles and responsibilities
5.1 Board / Directors
-
Own this Policy and ensure it is implemented.
-
Set the tone: zero tolerance for undisclosed conflicts.
-
Ensure adequate resources, training and independent oversight (where needed).
5.2 Managing Director / Senior Responsible Officer (SRO)
-
Overall accountability for conflict management on each procurement.
-
Ensures conflicts are assessed, mitigations implemented and recorded.
5.3 Procurement Lead / Project Lead
-
Runs conflict checks at key stages (see section 7).
-
Maintains the Conflicts Register for the project and ensures evaluators/SMEs are cleared.
-
Escalates high-risk conflicts immediately to the SRO and (where relevant) the client authority.
5.4 All Personnel
-
Must declare conflicts immediately and update declarations as circumstances change.
-
Must not participate in any activity where a conflict exists unless mitigation is agreed and recorded.
6. Standards of conduct
6.1 Duty to declare
Declarations are required:
-
on joining / appointment;
-
at the start of each procurement project;
-
before participating in evaluation/moderation;
-
before attending supplier meetings or market engagement;
-
whenever circumstances change.
Failure to declare may lead to disciplinary action (including dismissal/termination) and may be reportable to the client authority.
6.2 Gifts and hospitality
-
Personnel must not solicit gifts/hospitality.
-
Any offer must be declared and recorded (whether accepted or declined).
-
Accepting hospitality from bidders during an active procurement is generally prohibited unless explicitly approved in writing by the SRO and recorded, and only where it is low value, infrequent, and cannot reasonably be seen to influence decisions.
6.3 Confidentiality and information security
-
No sharing of non-public procurement information (specifications, evaluation approach, pricing, competitor details, moderation outcomes).
-
Use only approved systems and access controls.
-
Apply “need-to-know” access for evaluation and commercial data.
-
Report suspected data breaches immediately under our Information Security / GDPR processes.
7. Conflict management process
Stage A — Identify
We will run conflict checks at minimum at:
-
project initiation,
-
pre-market engagement,
-
publication of documents,
-
evaluation panel appointment,
-
moderation/consensus,
-
award recommendation,
-
call-off support, and
-
material contract variations or extensions.
Tools used include:
-
mandatory declaration forms,
-
register checks (Companies House links / prior roles as known),
-
panel briefings and verbal confirmation at evaluation start.
Stage B — Assess
Conflicts will be risk-rated considering:
-
proximity (direct financial interest vs. distant connection),
-
influence (ability to affect scoring / recommendations),
-
sensitivity (access to pricing, strategy, moderation discussions),
-
timing (active procurement vs. post-award),
-
perception risk and reputational impact.
Stage C — Manage / Mitigate
Mitigations may include (one or more):
-
Recusal from evaluation/moderation and any related discussions.
-
Reassignment to non-sensitive tasks or a different project.
-
Independent oversight (e.g., independent evaluator/moderator).
-
Information barriers (“Chinese walls”): restricted folders, separate teams, access logs.
-
No-contact rules with certain suppliers during the procurement.
-
Written instructions and reinforced confidentiality undertakings.
-
Removal of the conflicted person from the project (mandatory for high-risk conflicts).
Where we act for multiple contracting authorities or multiple frameworks, we will apply additional barriers to prevent cross-contamination of confidential information.
Stage D — Record
All conflicts and mitigations must be documented in:
-
the Conflicts Register, and
-
the project file / audit trail (including dates, decisions, and approver).
Stage E — Report / Escalate
We will promptly notify the contracting authority where:
-
the conflict involves an evaluator/moderator or key decision-maker,
-
the conflict is high risk (financial interest, close relationship, prior bid involvement),
-
the conflict could affect supplier confidence or procurement integrity,
-
a mitigation cannot fully remove the risk.
8. Procurement-specific controls (managing agent role)
To protect neutrality and avoid unfair advantage, we will:
-
keep objective, pre-published evaluation criteria and apply them consistently;
-
ensure evaluators sign confidentiality and conflict declarations before access to bids;
-
prohibit any Personnel involved in evaluation from providing bid-writing support to any supplier in that competition;
-
ensure supplier clarifications are managed through the agreed portal/process with equal treatment and documented responses;
-
keep moderation outcomes controlled, versioned and access-restricted;
-
ensure any incumbent or framework supplier is treated the same as non-incumbents (no privileged access).
9. Relationships with suppliers, consultants and subcontractors
Where we appoint external SMEs, consultants, or subcontractors:
-
they must sign equivalent conflict and confidentiality undertakings;
-
they must be conflict-checked before receiving any procurement material;
-
we will document their role, access level, and any mitigations.
10. Training and awareness
-
Mandatory induction training for all Personnel involved in procurement activity.
-
Refresher training at least annually (or more frequently where risk dictates).
-
Evaluation panel briefing at the start of each evaluation/moderation cycle.
11. Monitoring, audit and review
-
The SRO will sample-check declarations and the Conflicts Register on live projects.
-
The Policy will be reviewed annually and after any material incident or client request.
-
Lessons learned from complaints/challenges will be incorporated.
12. Breaches and sanctions
Breaches may include: failure to declare, improper influence, unauthorised disclosure, or acceptance of prohibited hospitality.
Consequences may include:-
removal from project duties,
-
disciplinary action up to dismissal/termination,
-
reporting to the contracting authority,
-
reporting under whistleblowing / fraud procedures where appropriate.
13. Whistleblowing and reporting concerns
Any person may report concerns confidentially to the SRO (or, if the SRO is implicated, to a Director not involved). Reports will be investigated promptly, with protection from retaliation for good-faith reporting.
-
Fraud & Counter-Fraud Policy
Applies to: ProcurePublic Limited and National Framework Partnership Limited (together, “the Group”)
Purpose: Prevent, deter, detect and respond to fraud and related wrongdoing in the Group’s role as a managing agent / framework provider supporting public sector procurement.Last updated: 12 February 2026
1) Policy statement (zero tolerance)
The Group operates a zero-tolerance approach to fraud, bribery, corruption, collusion, bid-rigging, misrepresentation, theft, money laundering, conflicts of interest abuse, and any other dishonest behaviour.
We will:
-
design and operate controls that reduce fraud risk;
-
act promptly on concerns and investigate fairly;
-
recover losses where possible and apply sanctions;
-
report criminal matters to appropriate authorities where indicated; and
-
support public sector clients with transparent, auditable procurement administration.
2) Scope
This policy applies to:
-
directors, employees, contractors, consultants, agency staff and secondees;
-
anyone acting on behalf of the Group (including third-party delivery partners); and
-
all activities connected to public sector procurement and framework management, including (without limitation): market engagement, tender / PSQ administration, evaluation support, award and standstill communications, framework onboarding, call-off processes, supplier management, rebate/fee administration, complaints/clarifications, and data handling.
This policy should be read alongside (as applicable): Code of Conduct, Conflicts of Interest Policy, Gifts & Hospitality Policy, Whistleblowing Policy, Information Security policy, Data Protection policy, Finance & Expenses policy, and any Client-specific procurement protocols.
3) Definitions
Fraud: Dishonest conduct intended to make a gain, cause loss, or expose another to risk of loss (including false representation, failure to disclose information, abuse of position).
Corruption / Bribery: Offering, giving, requesting or receiving an improper advantage to influence actions.
Collusion: Secret cooperation to deceive or gain unfair advantage (e.g., bid-rigging, cover pricing, bid rotation).
Procurement fraud: Any manipulation of procurement processes, evaluation, award, contract management or call-off processes for improper benefit.
Conflict of interest (COI): A situation where personal interests could improperly influence professional judgment (actual, potential or perceived).
Managing agent: The Group’s role in administering procurements/frameworks on behalf of contracting authorities and acting as an interface between clients and suppliers, while protecting the integrity of the process.
4) Legal and regulatory context (UK)
The Group will act consistently with applicable UK law and public procurement requirements relevant to each procurement (e.g., the governing procurement regime stated in the tender documentation), including principles of transparency, equal treatment, non-discrimination, integrity, and auditability.
This policy supports compliance with UK fraud/bribery and proceeds-of-crime legislation and good practice in counter-fraud controls.
5) Counter-fraud principles
We will apply these principles across our operations:
-
Tone from the top: Directors set expectations and enforce consequences.
-
Prevention by design: Clear processes, segregation of duties, and secure systems.
-
Transparency & audit trails: Decisions and communications are documented and retrievable.
-
Proportionate due diligence: Risk-based checks on suppliers and partners.
-
Speak-up culture: Easy reporting routes; no retaliation for good-faith concerns.
-
Swift response: Triage, containment, investigation, corrective action, recovery.
-
Learning: Root cause analysis and control improvement.
6) Roles and responsibilities
6.1 Directors
-
Approve this policy and ensure adequate resources and oversight.
-
Review serious incidents, trends, and management actions.
-
Ensure independence in investigations where conflicts may exist.
6.2 Managing Director / Senior Leadership (or equivalent)
-
Own implementation of this policy.
-
Ensure procurement operations are adequately controlled and monitored.
-
Ensure training completion and policy adherence.
6.3 Counter-Fraud Lead (designated role)
-
Maintain the fraud risk assessment and counter-fraud plan.
-
Manage reporting channels and triage process.
-
Coordinate investigations (or commission external support).
-
Maintain the Fraud Incident Register and reporting to Directors.
6.4 Finance Lead
-
Operate financial controls (banking, approvals, reconciliation, rebate/fee controls).
-
Lead recovery action and liaise with insurers/auditors where relevant.
6.5 Procurement Operations Lead
-
Ensure process integrity in tender administration, evaluation support, award steps, and call-off.
-
Enforce conflicts/gifts declarations and document controls.
6.6 All staff and representatives
-
Follow processes and controls.
-
Declare conflicts and gifts/hospitality as required.
-
Report concerns promptly.
7) Fraud risk areas specific to managing agents
The Group recognises heightened risk in:
-
Tender handling: tampering with submissions, late acceptance, unauthorised access, disclosure of confidential information.
-
Evaluation integrity: bias, undisclosed conflicts, manipulation of scoring, leaking evaluation content.
-
Supplier onboarding: misrepresentation, forged accreditations, false insurances, undisclosed exclusions/debarment issues.
-
Call-off/mini-competition: steering, unjustified direct awards, unequal bidder information, “friendly” specifications.
-
Rebate/fees: incorrect declarations, under-reporting spend, diversion of funds, duplicate invoices.
-
Data/security: phishing, credential compromise, invoice redirection, ransomware, unauthorised downloads.
-
Collusion and bid-rigging: suspicious pricing patterns, shared addresses, sequential bids, subcontracting swaps.
8) Prevention controls (minimum standards)
8.1 Governance and segregation of duties
-
Clear approval thresholds for: tender documents, publication, clarifications, evaluation packs, award notices, supplier onboarding, fee/rebate invoicing, write-offs, refunds, and bank detail changes.
-
Separation between: (a) tender administration, (b) evaluation coordination, (c) commercial/fee processing, and (d) payment release.
-
Dual authorisation for high-risk actions (e.g., supplier bank detail changes; manual adjustments).
8.2 Conflicts of interest
-
Mandatory COI declarations at: onboarding, annually, and per procurement.
-
COIs recorded, assessed, mitigated (e.g., recusal, access restrictions), and retained in the procurement file.
-
No one with a material COI may access bidder confidential data or influence outcomes.
8.3 Gifts and hospitality
-
Prohibition on soliciting gifts/hospitality.
-
Declaration and approval requirements; refusal where it could compromise perceived impartiality.
-
Additional restrictions during live procurements and standstill periods.
8.4 System and information security
-
Role-based access control (least privilege) for tender portals, document repositories, CRM, and finance systems.
-
MFA enabled where available; strong password policy; timely leaver access removal.
-
Controlled document versions; restricted evaluation documents; watermarking where appropriate.
-
Secure sharing: no bidder confidential information via personal email or unapproved channels.
8.5 Supplier and partner due diligence (risk-based)
-
Verify identity, company details, insurances, relevant accreditations, and declared information.
-
Red-flag checks for anomalies (e.g., newly formed entities, unusual ownership links across bidders).
-
Maintain records supporting selection and onboarding decisions.
8.6 Financial controls (including rebates/fees)
-
Written methodology for supplier rebate/fee calculation, invoicing cadence, and reconciliation.
-
Independent reconciliation: reported spend vs. client call-off data (where available) and supplier declarations.
-
Bank detail changes verified via an independent callback to a known number (not from the change request).
8.7 Training and awareness
-
Induction training covering: procurement integrity, fraud indicators, COI, gifts/hospitality, confidentiality, and reporting routes.
-
Annual refresher for all relevant staff; enhanced training for high-risk roles (procurement ops and finance).
9) Detection and monitoring
The Group will use proportionate monitoring, including:
-
exception reporting (manual overrides, late changes, unusual approvals);
-
audit sampling of procurement files (clarifications, evaluation trails, award steps);
-
analytics where feasible (pricing patterns, bidder link indicators, repeated subcontractor rotations);
-
periodic review of rebate/fee reconciliations and debtor balances; and
-
security monitoring for suspicious access/logins and phishing incidents.
10) Reporting concerns (speak-up)
10.1 What to report
Report immediately if you suspect or observe:
-
altered tender documents, leaked information, or unauthorised portal access;
-
pressure to favour a supplier or “adjust” scoring;
-
undisclosed conflicts, inducements, or suspicious hospitality;
-
forged documents or misrepresentation by suppliers;
-
suspicious invoice/bank change requests;
-
collusion indicators between bidders; or
-
any attempt to conceal or destroy records.
10.2 How to report
Concerns may be reported to:
-
the Counter-Fraud Lead;
-
a Director; or
-
via the Group’s Whistleblowing route (where established).
Reports can be made confidentially and (where the whistleblowing route allows) anonymously. Retaliation against anyone raising a concern in good faith is prohibited and will be treated as a disciplinary matter.
10.3 Information to include
-
who/what/when/where;
-
procurement name/reference;
-
documents/evidence available;
-
whether there is any immediate risk (e.g., live tender deadline, imminent payment).
11) Response and investigation
11.1 Triage and immediate actions
On receiving a report, the Counter-Fraud Lead will:
-
acknowledge receipt (where possible);
-
assess urgency and credibility;
-
take containment steps (e.g., restrict access, pause payments, preserve portal logs);
-
determine whether the matter is HR, operational, or criminal.
11.2 Investigation standards
Investigations will be:
-
fair, confidential and proportionate;
-
documented with an auditable trail;
-
evidence-led with secure handling of data;
-
conducted by appropriately independent personnel (external investigators where needed).
11.3 Reporting to clients and authorities
Where the matter affects a client procurement, the Group will notify the contracting authority promptly, consistent with confidentiality and legal obligations.
Criminal or regulatory reporting (e.g., law enforcement) will be considered where appropriate, particularly for fraud, bribery, corruption, or significant financial loss.11.4 Outcomes and sanctions
Depending on findings, actions may include:
-
disciplinary action up to and including dismissal/termination;
-
supplier exclusion/removal (where the procurement rules and terms permit);
-
contract remedies, recovery of funds, civil action;
-
process remediation and control improvements; and/or
-
referral to authorities.
12) Record keeping and audit
-
All procurements must maintain a complete file: approvals, communications, clarifications, evaluation documentation, award records, and any incident logs.
-
Fraud concerns and outcomes are recorded in a Fraud Incident Register, including lessons learned and control changes.
-
Records are retained in line with the Group’s retention schedule and client requirements.
13) Communication and culture
The Group will reinforce counter-fraud culture by:
-
clear internal communications (“integrity first”);
-
leadership visibility on standards and consequences;
-
celebrating good practice (e.g., reporting a near miss);
-
ensuring workloads and deadlines do not incentivise cutting corners.
14) Policy breaches
Any breach of this policy may result in disciplinary action and/or contract termination and may be reported externally where required. Failure to report known or strongly suspected fraud may itself be treated as misconduct.
15) Review and ownership
-
Owner: Counter-Fraud Lead (or nominated senior manager).
-
Approval: Board/Directors of the Group.
-
Review frequency: at least annually, and after any significant incident, regulatory change, or process change.
Appendix A — Fraud red flags (procurement managing agent)
Bidder / supplier indicators
-
identical wording/formatting across bids; same IP/domain patterns where visible; shared addresses/directors.
-
unusual subcontracting patterns between frequent “competitors”.
-
last-minute bid submissions with repeated “technical issues” requests.
Process indicators
-
pressure to share information outside controlled channels.
-
unexplained changes to evaluation packs, weightings, or clarifications.
-
evaluation comments inconsistent with scores; missing rationale.
Financial indicators
-
requests to change bank details urgently; new bank accounts with different names.
-
invoice amounts that split approvals; duplicate invoices; unexplained credits.
-
rebate/spend declarations inconsistent with call-off data.
Behavioural indicators
-
reluctance to take leave; single person controlling a whole process.
-
undisclosed relationships with suppliers; unusual hospitality.
Appendix B — Incident log (minimum fields)
-
Date/time reported; reporter details (if provided); procurement reference
-
Allegation type (fraud/bribery/collusion/COI/data breach/other)
-
Immediate actions taken (containment)
-
Evidence preserved (systems/logs/documents)
-
Investigator assigned and independence checks
-
Findings and decision rationale
-
Client notification (date/summary)
-
Financial impact (actual/estimated) and recovery action
-
Control improvements and completion dates
-
Closure approval and retention location
-
Supplier Code of Conduct and Ethical Procurement
Last updated: 12 February 2026
ProcurePublic Limited and National Framework Partnership Limited (together, “the Managing Agent”) expect all suppliers, bidders, subcontractors, consortium partners and agents to meet the standards below when participating in, or delivering under, any framework/DPS/contract managed on behalf of public sector Clients.
What we expect from suppliers
1) Integrity and fair competition
-
Bid and deliver honestly and transparently.
-
Compete fairly: no bid-rigging, collusion, price-fixing, market sharing or improper information exchange.
-
Provide truthful, complete information in tenders, clarifications and reporting.
2) Conflicts of interest
-
Declare actual, potential or perceived conflicts promptly (during bidding and delivery).
-
Put effective mitigation in place (e.g., staff changes, information barriers) when required.
3) Zero tolerance for bribery, corruption and fraud
-
Do not offer/accept bribes or facilitation payments.
-
Maintain appropriate anti-bribery controls, training and accurate records.
-
Report suspected wrongdoing connected to any procurement or contract activity.
4) Gifts and hospitality
-
No cash or cash equivalents (e.g., vouchers).
-
Any hospitality must be infrequent, modest, legitimate and transparent, and compliant with Client rules.
5) Confidentiality, data protection and cybersecurity
-
Protect tender/contract information and do not misuse confidential information.
-
Comply with UK GDPR and maintain appropriate information security.
-
Notify without undue delay of any data breach or significant cyber incident impacting delivery.
6) People, labour standards and modern slavery
-
Uphold human rights and fair labour standards.
-
No forced labour or child labour; comply with employment law and safe working practices.
-
Where required, maintain a Modern Slavery statement and supply chain due diligence.
7) Health & safety and compliance
-
Meet all applicable H&S duties and relevant industry standards.
-
Use competent, qualified, appropriately insured staff and subcontractors.
8) Environmental and social responsibility
-
Comply with environmental law and reduce impacts where practicable.
-
Support Client sustainability / ESG requirements where specified.
9) Supply chain responsibility
-
You remain responsible for subcontractors and agents.
-
Flow down relevant obligations (H&S, data protection, modern slavery, confidentiality, ethical conduct).
Monitoring and assurance
Suppliers must cooperate with reasonable requests for evidence, audits (desk-based or on-site), KPIs, and corrective action plans where needed.
If standards are not met
Breaches may result in corrective actions, enhanced monitoring, suspension of award/mobilisation, removal from a framework/DPS (where rules permit), termination of call-off contracts, reporting to authorities, and recovery of losses (as applicable under procurement/contract rules).
-
Data Protection Policy (UK GDPR / Data Protection Act 2018)
Last updated: 12 February 2026
1. Purpose
This policy explains how the Companies process personal data in compliance with:
-
the UK General Data Protection Regulation (UK GDPR); and
-
the Data Protection Act 2018 (DPA 2018).
It applies to all employees, directors, contractors, agency staff and third parties acting on behalf of the Companies.
2. Scope
This policy covers personal data processed in connection with:
-
acting as a managing agent for public sector procurement and framework management;
-
supplier onboarding, tendering, evaluation support, contract award and contract management support;
-
the Companies’ corporate operations (HR, finance, marketing, compliance, IT, customer support);
-
handling data subject rights requests, security incidents and breaches.
3. Definitions
-
Personal data: information relating to an identified or identifiable natural person.
-
Special category data: e.g., health data, biometric data, racial/ethnic origin, etc.
-
Controller / Processor: as defined in UK GDPR (controller decides purposes/means; processor acts on controller’s instructions).
-
Contracting Authority / Public Body / Client: the public sector organisation the Companies support.
4. Data Protection Principles
The Companies will ensure personal data is:
-
processed lawfully, fairly and transparently
-
collected for specified, explicit purposes
-
adequate, relevant and limited (data minimisation)
-
accurate and kept up to date
-
kept no longer than necessary (storage limitation)
-
processed securely (integrity and confidentiality)
-
managed with accountability (records, policies, training, governance)
5. Governance and Responsibilities
5.1 Accountability
The Companies will maintain appropriate governance, including:
-
documented policies and procedures;
-
training and awareness for staff involved in procurement activity;
-
a Record of Processing Activities (ROPA) (controller and processor where applicable);
-
appropriate controller–processor terms and data sharing arrangements.
5.2 Key roles (insert names/titles)
-
Data Protection Lead / DPO (if appointed): [NAME / ROLE]
-
Information Security Lead: [NAME / ROLE]
-
Senior Responsible Officer: [NAME / ROLE]
5.3 Contact details
-
Data protection contact email: [privacy@…]
-
Postal address: [REGISTERED ADDRESS]
6. Our Role in Public Sector Procurement
The Companies may act in different capacities depending on the activity:
6.1 Processor (typical managing agent activities)
When supporting a Contracting Authority (e.g., running supplier communications, tender administration, evaluation support on client instruction), the Companies will generally act as a processor. In these cases:
-
the Contracting Authority is the controller;
-
processing will be governed by a written contract meeting UK GDPR Art. 28 requirements;
-
the Companies will only process personal data on documented instructions, unless required by law.
6.2 Controller (our own business operations)
The Companies act as controller for personal data processed for internal operations such as:
-
staff and contractor management;
-
supplier relationship management for the Companies’ own services;
-
finance, invoicing, audit, compliance;
-
running the Companies’ websites/CRM and handling enquiries.
6.3 Joint controllers (occasionally)
Where the Companies and a Contracting Authority jointly determine purposes and means (less common), the parties will document:
-
respective responsibilities (including transparency notices and rights handling);
-
a point of contact for data subjects.
7. Categories of Personal Data We Process
Depending on context, we may process:
-
Identity and contact data: names, job titles, work emails/phones, organisation details.
-
Procurement data: tender submissions containing personnel CVs, experience, qualifications, references, accreditations, disclosure statements.
-
Due diligence and compliance: director information, beneficial ownership info (where provided), conflict declarations, insurance contacts.
-
System and usage data: logins, audit trails, IP addresses, device/browser info (where applicable).
-
Communications: emails, meeting notes, call recordings (if used and notified).
-
Special category data: not routinely required; if provided within tenders (e.g., equality information), it will be handled with enhanced safeguards.
-
Criminal offence data: not routinely required; if required for certain procurements (e.g., exclusion grounds checks), processing will follow DPA 2018 conditions and documented controls.
8. Lawful Bases for Processing
The lawful basis will vary by activity:
8.1 Processor activity for a Contracting Authority
The Contracting Authority determines the lawful basis as controller. The Companies process under the authority’s instructions.
8.2 Controller activity (our own operations)
We rely on one or more of:
-
Contract (to provide services and manage relationships)
-
Social Value Policy Statement
Social Value Policy Statement
Document Title: Social Value Policy Statement
Organisation: ProcurePublic Limited
Version: 1.0
Review Period: Annual
Owner: Managing Director1. Purpose
ProcurePublic Limited is committed to delivering measurable social, economic and environmental value through the procurement routes, frameworks and dynamic markets that it establishes and manages on behalf of public sector clients.
We recognise that public procurement should achieve more than compliance and value for money alone. It should also contribute positively to local communities, support inclusive economic growth, improve environmental performance, and create wider public benefit in accordance with the principles of the Public Services (Social Value) Act 2012 and broader public sector objectives.
This statement sets out ProcurePublic’s approach to embedding social value within its procurement activity and the expectations placed upon appointed suppliers.
2. Our Commitment
ProcurePublic seeks to ensure that its procurement solutions support:
-
Economic value, through supporting local supply chains, SMEs, VCSEs and responsible employment practices.
-
Social value, through creating opportunities for apprenticeships, training, employment, community engagement and improved social outcomes.
-
Environmental value, through encouraging carbon reduction, resource efficiency, sustainable methods of working and environmental responsibility.
Our procurement routes are designed to enable contracting authorities to evaluate and secure social value commitments from suppliers in a manner proportionate to the subject matter, scope and value of the contract.
3. Policy Objectives
Through our frameworks and dynamic markets, ProcurePublic aims to:
-
Support public bodies to incorporate social value into procurement processes in a clear, lawful and proportionate manner.
-
Encourage suppliers to deliver commitments that produce tangible benefits for communities and service users.
-
Promote fair, ethical and responsible business practices across our supply chain.
-
Encourage participation by SMEs, local businesses and voluntary, community and social enterprise organisations where appropriate.
-
Support environmental sustainability and the transition to lower-carbon service delivery.
-
Create procurement routes that allow social value commitments to be monitored and, where appropriate, reported during contract delivery.
4. Scope
This policy applies to:
-
Frameworks established by ProcurePublic;
-
Dynamic Markets and other procurement routes administered by ProcurePublic;
-
Supplier selection, tender evaluation and contract award support provided by ProcurePublic;
-
The organisation’s own operational conduct, where relevant.
5. Social Value Themes
ProcurePublic’s social value approach is generally aligned to the following themes.
5.1 Economic Wellbeing
We encourage procurement outcomes that:
-
Create employment and apprenticeship opportunities;
-
Support local labour and local supply chains;
-
Increase access to opportunities for SMEs and VCSEs;
-
Promote skills development, work placements and training initiatives;
-
Encourage prompt payment and fair commercial terms throughout the supply chain.
5.2 Social Wellbeing
We encourage procurement outcomes that:
-
Support community cohesion and local engagement;
-
Create opportunities for disadvantaged or underrepresented groups;
-
Promote equality, diversity and inclusion;
-
Improve health, wellbeing and safety outcomes;
-
Deliver community benefits linked to the contract and the needs of the client.
5.3 Environmental Wellbeing
We encourage procurement outcomes that:
-
Reduce greenhouse gas emissions and support net zero ambitions;
-
Minimise waste and improve recycling and reuse;
-
Improve energy and water efficiency;
-
Reduce pollution and unnecessary travel;
-
Promote sustainable sourcing, biodiversity enhancement and responsible environmental management.
6. How ProcurePublic Applies Social Value
ProcurePublic may embed social value within its procurement routes by:
-
Including social value considerations within procurement documentation where relevant and proportionate;
-
Allowing contracting authorities to evaluate bidders’ proposed social value commitments as part of call-off competitions or further competitions;
-
Encouraging contract-specific social value delivery plans;
-
Promoting the use of measurable and realistic commitments rather than generic statements;
-
Supporting clients to link social value outcomes to local priorities and community needs;
-
Encouraging post-award monitoring of social value commitments as part of contract management.
The exact approach will vary depending on the nature of the goods, works or services being procured and the requirements of the contracting authority.
7. Supplier Expectations
ProcurePublic expects suppliers appointed to its procurement routes to:
-
Operate lawfully, ethically and responsibly;
-
Comply with applicable employment, health and safety, equality and environmental legislation;
-
Support fair work practices and workforce wellbeing;
-
Consider opportunities to generate local economic and community benefit;
-
Work collaboratively with clients to identify meaningful social value outcomes;
-
Provide evidence of delivery where social value commitments form part of the award or contract performance requirements.
Suppliers should ensure that any commitments offered are specific, deliverable and relevant to the contract.
8. Governance and Compliance
ProcurePublic is committed to ensuring that social value is considered in a manner that is:
-
Relevant to the subject matter of the procurement;
-
Transparent and proportionate;
-
Non-discriminatory and compliant with applicable procurement legislation;
-
Capable of objective assessment where used as part of an evaluation process.
Social value considerations will be structured so as to support contracting authorities in meeting their duties while maintaining fairness, competition and value for money.
9. Monitoring and Continuous Improvement
ProcurePublic will keep its approach to social value under review and will seek to improve its procurement documentation and guidance over time. This may include:
-
Reviewing social value criteria used across procurement routes;
-
Seeking feedback from clients and suppliers;
-
Updating internal guidance to reflect legislative or policy developments;
-
Promoting good practice in contract management and reporting.
10. Internal Commitment
As an organisation operating within the public sector procurement environment, ProcurePublic is committed to conducting its own activities responsibly and professionally. We support procurement models that aim to generate wider public benefit and we seek to work with clients and suppliers who share those values.
-
Records Management & Retention Policy
Records Management & Retention Policy
Last updated: 12 February 2026
1. Purpose
This policy sets out how we create, manage, store, protect, retain, retrieve and dispose of records generated or received while delivering public sector procurement services as a managing agent and framework provider (including supporting contracting authorities and other public sector clients with tendering, evaluation, award, framework management and call-off activity).
It ensures we:
-
maintain a complete, auditable “procurement file” (and associated contract/framework records);
-
retain records for appropriate periods (legal/regulatory, contractual, operational and evidential needs);
-
comply with data protection and confidentiality obligations; and
-
dispose of records securely and defensibly.
2. Scope
This policy applies to all workers (employees, directors, contractors, associates) and all records in any format (electronic or paper) that relate to our services, including records held in:
-
email and collaboration tools (e.g., Outlook/Teams/SharePoint/OneDrive);
-
CRM and workflow systems (e.g., Zoho and any procurement portals);
-
file shares, local devices and removable media; and
-
third-party tendering platforms used on behalf of clients.
3. Definitions
-
Record: Information created/received as evidence of a business activity (e.g., approvals, evaluations, clarification logs, award decisions, signed agreements).
-
Procurement file: The structured set of records evidencing the end-to-end procurement lifecycle (planning → market engagement → tender → evaluation → award → framework management/call-off).
-
Retention period: The minimum length of time a record must be kept before disposal/review.
-
Disposition: Secure destruction, deletion, anonymisation, or transfer to a client/archives as appropriate.
-
Legal hold: A suspension of disposal where litigation, audit, investigation, complaint or FOI/EIR-related preservation is required.
4. Policy principles
We follow these core principles:
4.1 Accountability and auditability
We maintain records sufficient to evidence key decisions and actions taken during procurement activity, including communications, evaluation and award rationale.4.2 Data minimisation and storage limitation
We only retain personal data as long as necessary and in line with documented retention periods.4.3 Security by design
Records are protected against unauthorised access, alteration or loss (access controls, MFA where available, encryption, secure sharing, logging, backups).4.4 Single source of truth
Authoritative records must be stored in approved systems/locations, with naming/version control.4.5 Defensible disposal
Disposal is timely, consistent, documented, and suspended where a legal hold applies.5. Roles and responsibilities
Board/Directors
-
Own this policy and ensure resources and oversight.
Managing Director / Policy Owner
-
Approves the retention schedule, ensures implementation and annual review.
Records Management Lead (or nominated manager)
-
Maintains the retention schedule and file plan; conducts periodic audits; coordinates disposal.
Information Governance / Data Protection Lead (DPO or nominated person)
-
Advises on personal data handling, DSAR support, breaches and privacy-by-design.
Procurement / Framework Managers
-
Ensure procurement files are complete, stored correctly, and handed over/closed properly.
All staff and contractors
-
Create accurate records, store them in the correct place, avoid unmanaged copies, and follow legal hold instructions.
6. Record lifecycle requirements
6.1 Create and capture
-
Records must be created at the time of the activity (not retrospectively where avoidable).
-
Procurement decisions must be recorded in writing (e.g., evaluation notes, moderation outcomes, approval to award).
6.2 Classify and file
-
Each procurement must have a unique reference (e.g., PP/NFP-CLIENT-YEAR-REF).
-
Records must be filed under a standard folder structure (see Section 8).
6.3 Version control
-
Use controlled documents for procurement packs (ITT/PSQ, evaluation model, pricing matrices).
-
Final versions must be clearly marked “FINAL” and locked where appropriate.
6.4 Access control
-
Apply least-privilege access: only those needing access can access.
-
Separate restricted folders for: legal matters, commercially sensitive pricing, personal data, and HR.
6.5 Sharing and transfer
-
Share externally using secure links with expiry where possible.
-
When acting for a client, provide a “procurement file pack” at close-out (or on request) in an agreed format.
6.6 Backups
-
Backups are not an alternative filing system. Records must still be stored correctly.
-
Disposal requests should consider backup retention cycles (see Section 10).
7. Minimum procurement record-keeping baseline (public procurement)
Where procurement activity is subject to public procurement regimes, we will retain records at least in line with the relevant statutory record-keeping requirements for contracting authorities, because our clients may need those records to demonstrate compliance:
-
Under the Public Contracts Regulations 2015, contracting authorities must keep sufficient documentation to justify decisions at all stages and keep that documentation for at least 3 years from the date of award.
-
Under the Procurement Act 2023, contracting authorities must keep records sufficient to explain “material decisions” and relevant communications, generally for 3 years (and specific rules apply where a contract is not awarded/entered into).
Because challenges, claims and audits can extend beyond 3 years, our standard retention periods for core procurement and contract records will usually be longer than the statutory minimums (see Section 9), including alignment with limitation periods for claims under simple contracts (commonly 6 years).
8. File plan (standard structure for each procurement / framework)
Create a single top-level folder (or case) per procurement/framework:
-
00_Admin & Governance
-
procurement initiation, approvals, governance minutes, conflict declarations
-
-
01_Planning & Strategy
-
business case, options appraisal, route to market, risk assessment
-
-
02_Market Engagement
-
RFI/EOI, notes, Q&A, outputs
-
-
03_Procurement Documents
-
PSQ/Selection, ITT, specifications, schedules, evaluation model, pricing templates
-
-
04_Communications & Clarifications
-
clarification log, bidder queries, answers, correspondence
-
-
05_Submissions
-
bids, attachments, certificates, forms (access restricted)
-
-
06_Evaluation & Moderation
-
individual scoring, moderation notes, consensus scores, audit trail
-
-
07_Award & Standstill
-
award approvals, notices, debrief letters, standstill logs
-
-
08_Contracting / Framework Award
-
executed agreements, schedules, variations, onboarding
-
-
09_Framework Management / Call-offs
-
mini-competitions, direct awards where permitted, call-off award files
-
10_Performance / KPI / Issues
-
MI, supplier performance, disputes, credits, rectification
-
11_Close-out & Handover
-
close-out checklist, file index, transfer pack to client
9. Retention schedule (summary)
General rule: keep records for the period in the table below from the trigger event, then securely dispose unless a legal hold applies.
Where a client contract requires longer retention, the client requirement prevails.
Where records relate to a deed, property, or other higher-risk category, consider 12 years retention (or longer) where justified.9.1 Core retention table
Record category Examples Trigger event Retention period (minimum) Procurement file – above-threshold / regulated approvals, procurement docs, clarifications, evaluation, moderation, award decision, notices Contract award (or termination decision) 6 years (and ≥3 years statutory baseline) Unsuccessful bidder records bids, evaluator notes, clarifications Award date 3 years (longer if challenge risk / complaint) Standstill & debrief standstill letters, debrief pack, feedback notes End of standstill 3 years (or align to procurement file if dispute) Framework agreement & schedules (executed) signed framework, schedules, KPIs, pricing Framework expiry/termination 6 years (12 years if executed as deed) Call-off / mini-competition files call-off ITT, quotes, evaluation, award Call-off expiry/termination 6 years (12 if deed) Variations, extensions, waivers change control, approvals, updated schedules Variation date or contract end (whichever later) 6 years after contract end Supplier onboarding & due diligence insurances, policies, certifications, exclusion checks Supplier offboard / framework end 6 years (or earlier where superseded; keep latest active set + audit trail) Contract management & performance KPIs, meeting minutes, service reports Contract end 6 years Complaints, challenges, disputes correspondence, evidence packs, legal advice (restricted) Final resolution 6 years (or longer if advised by counsel/insurer) Finance & tax (company records) invoices, rebates, statements, VAT records End of financial year 6 years from end of FY (or longer where required) Corporate governance board minutes, resolutions, statutory registers Event date Permanent (or as long as company exists, plus any statutory minimums) HR (employment) contracts, right to work, training Employment end 6 years (typical) Marketing (non-procurement) website content approvals, newsletters Superseded 2 years (unless needed for evidencing consent) Information security logs access logs, audit logs Log creation 12–24 months (unless incident) Incident & breach records security incidents, data breaches Closure date 6 years (or longer if claim/insurer requirement) 9.2 Notes on personal data within procurement records
-
Personal data in bids (CVs, references, contact details) is retained with the procurement file only as long as needed to evidence decisions and manage audit/challenge risk, then disposed securely in line with the schedule and storage limitation principle.
-
Where practical, minimise personal data captured (e.g., role-based contacts rather than personal mobiles; redact irrelevant personal information before wider sharing).
10. Legal holds (preservation)
A legal hold must be applied where any of the following are anticipated or active:
-
procurement challenge, threatened litigation, claim, injunction, or standstill dispute;
-
audit (internal/external), regulator enquiry, whistleblowing investigation;
-
complaint escalation (e.g., to a client’s governance route);
-
formal information request requiring preservation.
When a legal hold is active:
-
destruction/deletion is suspended for affected records (including drafts where relevant);
-
records must not be altered (preserve metadata where possible);
-
Records Lead maintains a hold register (case ref, scope, start date, end date, custodian).
11. Disposal and destruction standards
11.1 Approval
-
Disposal runs are authorised by the Records Lead and approved by a Director (or delegated authority).
11.2 Secure disposal
-
Paper: cross-cut shredding or certified confidential waste provider.
-
Electronic: secure deletion consistent with the platform (including emptying recycle bins, removing shared links, and wiping devices before disposal).
-
Backups: disposed in line with backup lifecycle; where immediate purge is impossible, ensure it is purged at the next cycle and document it.
11.3 Disposal log
-
Maintain a disposal log including: record category, date range, disposal date, method, approver.
12. Access requests, FOI/EIR and disclosure
Because we act as a managing agent for public sector bodies, we may hold information that is:
-
disclosable by the client under FOI/EIR, or
-
required for audit/transparency obligations.
Process
-
If we receive an FOI/EIR request directly, we immediately forward to the client’s FOI team and notify our Information Governance Lead.
-
We preserve potentially relevant records (apply legal hold) until the client confirms release/closure.
-
We provide the client with copies/export packs securely and promptly, with redaction support where agreed.
13. Training and compliance
-
Mandatory induction for new starters covering: where to file, handling bid data, naming conventions, secure sharing, and legal holds.
-
Annual refresher for procurement and framework teams.
-
Spot checks of procurement files (completeness, access permissions, correct storage).
14. Exceptions and approvals
Any deviation from this policy (e.g., shorter retention, accelerated deletion, off-system storage) must be:
-
risk assessed,
-
approved by a Director, and
-
recorded (with justification, scope and duration).
15. Document control
-
Owner: Managing Director (or nominated Director)
-
Custodian: Records Management Lead
-
Review frequency: annually or on major legal/regulatory/system change
-
Approval: Board/Directors
-
Versioning: maintain a version history and change log within the policy document
-
Cyber Incident Response and Personal Data Breach Management Procedure
Last updated: 12 February 2026
For: ProcurePublic Limited and National Framework Partnership Limited (“the Companies”)
Applies to: All staff, directors, contractors, temporary workers, and third parties acting for the Companies
Context: Managing agent for public sector procurement (handling supplier/authority information, tender data, evaluation materials, contract documentation)
1. Purpose
This procedure sets out how the Companies will:
-
detect, assess, contain, investigate and recover from cyber security incidents; and
-
manage personal data breaches in accordance with UK GDPR and the Data Protection Act 2018, including notifying relevant controllers (public sector clients) and the Information Commissioner’s Office (ICO) where required.
2. Scope
This applies to incidents affecting:
-
Company systems (email, endpoints, servers, cloud services, CRM, file storage, collaboration tools);
-
procurement systems used/managed by the Companies (e-tendering portals, document repositories, evaluation workspaces);
-
data processed for or on behalf of public sector clients (as processor) and data processed for internal business operations (as controller);
-
third party services where the Companies’ data is hosted/processed.
Incidents include (non-exhaustive):
-
ransomware/malware, phishing, credential compromise, business email compromise (BEC)
-
unauthorised access, account takeover, privilege escalation
-
data exfiltration/leak, accidental disclosure, misdirected emails
-
loss/theft of devices or removable media
-
denial of service impacting procurement timetables
-
supplier or third-party compromise that affects Company data
3. Definitions
-
Cyber incident: An event that jeopardises confidentiality, integrity, or availability of information systems/services.
-
Personal data breach: A breach of security leading to accidental or unlawful destruction, loss, alteration, unauthorised disclosure of, or access to, personal data.
-
Controller / Processor: UK GDPR meanings (client authority typically controller; Companies often processor as managing agent).
-
Severity: Impact-based classification used to drive escalation and response.
4. Roles and Responsibilities
4.1 Incident Response Team (IRT)
Minimum roles (may be the same person in small teams):-
Incident Manager (IM): Owns response, coordinates actions, approves comms.
-
IT/Security Lead: Technical triage, containment, forensics coordination.
-
Data Protection Lead: Determines whether a personal data breach occurred; notification requirements; breach log.
-
Business Lead (Procurement Ops): Assesses procurement impacts (deadlines, bidder fairness, standstill).
-
Comms Lead: External/internal messaging, client liaison (with IM approval).
-
Legal/Contracts (optional): Reviews contractual notice obligations, liability and regulatory exposure.
4.2 All staff / contractors
-
Report suspected incidents immediately (see Section 6).
-
Preserve evidence (do not delete emails/logs; do not power off unless instructed).
4.3 Third parties
-
Must notify the Companies without undue delay of any incident affecting Company data/services, per contract.
5. Guiding Principles
-
Safety first: Contain risk quickly and proportionately.
-
Protect procurement integrity: Maintain confidentiality, equal treatment, audit trail.
-
Evidence preservation: Support investigations and potential legal/regulatory requirements.
-
Timely notification: Especially where acting as a processor for public bodies; support their 72-hour ICO duty.
-
Clear communications: Accurate, controlled, and need-to-know.
6. Reporting and Initial Actions
6.1 How to report
Report immediately via:-
Email: [security@…] and [privacy@…] (or a shared mailbox)
-
Phone/Teams escalation route: [NUMBER / CHANNEL]
-
If email compromise is suspected, use phone/Teams not email.
6.2 What to include
-
who is reporting and contact details
-
what happened (or what seems suspicious)
-
when it started / was discovered
-
affected systems/accounts (if known)
-
any actions already taken
6.3 “Do now” checklist (for reporters)
-
Disconnect device from network if actively infected (Wi-Fi off / cable out).
-
Don’t click links, forward suspicious emails, or “test” malware.
-
Keep the device powered on (unless encryption/ransomware spreading and instructed otherwise).
-
Take screenshots/photos of suspicious messages if safe.
7. Severity Classification (used for escalation)
SEV1 – Critical:
Active compromise, widespread impact, ransomware, confirmed data exfiltration, major procurement disruption, privileged account compromise, or likely reportable personal data breach with high risk.SEV2 – High:
Limited compromise, suspected unauthorised access, exposure of sensitive procurement docs, moderate service disruption, suspected reportable breach.SEV3 – Medium:
Phishing attempts with no compromise, malware quarantined, minor misconfiguration with limited exposure.SEV4 – Low:
Benign events, false positives, low-impact alerts.Escalation triggers: SEV1/SEV2 notify Incident Manager immediately; commence incident bridge within 30 minutes.
8. Incident Lifecycle Procedure
Phase A — Triage (0–2 hours)
-
Open an incident record in the Incident Register (Section 13). Assign Incident ID.
-
Confirm category and severity.
-
Identify scope (systems, users, data types, client procurements affected).
-
Decide immediate containment steps (below).
-
Notify required internal stakeholders (IRT roles).
Phase B — Containment (asap)
Containment options (select proportionately):
-
disable affected accounts; force password reset; revoke tokens/sessions
-
isolate endpoints/servers; block malicious IPs/domains
-
suspend email forwarding rules; check mailbox rules and OAuth apps
-
temporarily restrict access to procurement folders/workspaces
-
suspend integrations (CRM sync, automated mail merge, e-sign) if compromise suspected
-
preserve logs (mail server, endpoint, cloud audit logs) and snapshots
Important procurement control:
If tender data confidentiality may be compromised, the Business Lead assesses whether to pause communications, extend deadlines, or implement corrective measures to ensure equal treatment and transparency.Phase C — Investigation & Analysis (within 24–72 hours, ongoing)
-
Determine root cause (phishing, vulnerability, misconfig, credential reuse).
-
Establish timeline: initial access, lateral movement, exfiltration, changes made.
-
Identify data impacted: what personal data and/or procurement materials, whose data, volume.
-
Determine whether incident is a personal data breach (Section 9).
-
If needed, engage external incident response/forensics provider under NDA.
-
Maintain evidence integrity (hashing, read-only exports, chain-of-custody notes where practical).
Phase D — Eradication & Recovery
-
remove malware, close vulnerabilities, revoke compromised credentials/certs
-
restore systems from known-good backups, validate integrity
-
monitor for re-compromise (enhanced logging, alerting, threat hunting)
-
re-enable services progressively with sign-off by Incident Manager
Phase E — Lessons Learned (within 10 working days of closure)
-
complete a post-incident review: what went well, what failed, improvements
-
update controls, training, playbooks, vendor management
-
report summary to senior leadership and, where relevant, affected clients
9. Personal Data Breach Decision Process (UK GDPR)
9.1 Determine if it’s a personal data breach
A breach includes:-
unauthorised disclosure (e.g., misdirected tender email with CVs)
-
unauthorised access (e.g., compromised mailbox with supplier contacts)
-
loss/destruction (e.g., ransomware without recoverable backups)
-
alteration (e.g., tampering with evaluation records)
9.2 Determine risk to individuals
Assess:-
type of data (contact details vs. ID documents vs. special category data)
-
volume, sensitivity, vulnerability of individuals
-
likelihood of harm (fraud, identity theft, confidentiality damage)
-
whether data was encrypted, redacted or otherwise protected
-
whether attackers exfiltrated data or only had potential access
9.3 Controller/processor considerations
-
When acting as processor for a public body, the Companies must notify the controller without undue delay after becoming aware of a personal data breach.
-
When acting as controller (Company operational data), the Companies decide whether to notify the ICO and/or individuals.
10. Notification Procedure
10.1 Notify public sector clients (where the Companies are processor)
Timing: without undue delay (target: within 24 hours of awareness where personal data may be involved).
Method: direct to client’s named data protection / security contact, plus procurement lead.
Content (minimum):-
Incident ID, date/time detected and (if known) started
-
systems affected and whether incident is ongoing
-
categories of personal data involved and approximate number of data subjects/records
-
likely consequences/risks
-
measures taken or proposed to address and mitigate
-
steps the client may need to take (e.g., user password resets, supplier comms)
-
point of contact and next update time
Important: If tender integrity is affected (confidential bidder information exposure), include recommended procurement mitigations (e.g., extend deadline, reissue documents, audit access).
10.2 Notify the ICO (where the Companies are controller)
If a personal data breach is likely to result in a risk to individuals’ rights and freedoms, notify the ICO within 72 hours of becoming aware.
If you miss 72 hours, record reasons for delay.10.3 Notify affected individuals (where required)
If the breach is likely to result in a high risk to individuals, notify them without undue delay, unless an exemption applies (e.g., data encrypted, mitigation removed high risk, disproportionate effort—then consider public communication).
All notifications must be approved by the Incident Manager and Data Protection Lead (and legal where appropriate).
11. Communications and Confidentiality
11.1 Internal communications
-
Use an incident-only Teams channel or bridge.
-
Share information strictly on a need-to-know basis.
-
Mark sensitive messages “CONFIDENTIAL – INCIDENT RESPONSE”.
11.2 External communications
-
Only the Incident Manager (or nominated Comms Lead) may communicate externally.
-
Avoid speculation. Stick to verified facts.
-
For procurement contexts: align messaging with the Contracting Authority’s communications plan to suppliers/bidders.
11.3 Law enforcement and insurers
Where appropriate, consider:-
reporting to Action Fraud / police (UK) for cybercrime
-
notifying cyber insurance providers promptly per policy conditions
12. Procurement-Specific Controls During an Incident
Because the Companies support public procurements, apply these additional measures:
-
Freeze evaluation environments: restrict access, snapshot audit logs, preserve scoring records.
-
Document access audit: identify who accessed what and when (especially ITT docs, bidder submissions).
-
Equal treatment: if any bidder gained unintended access, inform the Contracting Authority immediately to determine corrective steps.
-
Timetable impacts: consider extending deadlines or restarting stages if fairness compromised.
-
Standstill/award: if incident affects award documentation or communications, pause and agree a lawful approach with the Contracting Authority.
13. Record Keeping (Incident Register & Breach Log)
The Companies maintain:
-
Cyber Incident Register (all incidents, including near-misses)
-
Personal Data Breach Log (all personal data breaches, whether or not reported)
Records must include:
-
Incident ID, dates/times, summary, severity
-
systems/data affected, number of records (estimated)
-
decisions taken and rationale (including notification decisions)
-
containment/recovery actions
-
communications issued
-
lessons learned and improvements
Retention: keep records for at least 6 years (or longer if required by contract, insurance, or active dispute).
14. Training and Testing
-
Annual mandatory training: phishing awareness, reporting, data handling
-
Role-based training for procurement teams (secure tender handling, redaction, sharing controls)
-
Tabletop exercise at least annually (include a procurement scenario + personal data breach)
-
Periodic technical testing: MFA, backups restore tests, log retention, incident simulations
15. Third-Party and Supplier Incidents
Where a third party processes Company or client data:
-
ensure contracts include incident notification and cooperation clauses
-
confirm their MFA, logging, encryption, and security certifications (where proportionate)
-
require evidence of remediation and root-cause resolution after an incident
-
consider suspension/exit plans for high-risk vendors
16. Appendices (Templates)
Appendix A — Incident Report Form (initial)
-
Reporter name/role/contact
-
Date/time discovered
-
Description of event
-
Systems/accounts involved
-
Data potentially affected (what/whose)
-
Screenshots/evidence available
-
Immediate actions taken
Appendix B — Processor Breach Notification to Client (email template)
Subject: URGENT: Security Incident Notification – [Incident ID] – Potential Personal Data Breach
Dear [Client DPO/InfoSec Contact],
We are notifying you of a security incident identified on [date/time]. This incident may involve personal data processed on your behalf in relation to [procurement/framework name/reference].
Summary: [brief factual summary]
Status: [ongoing/contained]
Systems affected: [ ]
Personal data potentially involved: [categories]
Estimated volume: [data subjects/records – if known]
Likely impact/risks: [ ]
Mitigation actions taken: [ ]
Recommended client actions: [ ]
Next update by: [time/date]
Point of contact: [name/phone/email]Kind regards,
[Incident Manager Name]
ProcurePublic Limited / National Framework Partnership LimitedAppendix C — ICO Notification Checklist (controller)
-
Is there risk to individuals?
-
What happened and when?
-
Categories/volume of personal data and subjects
-
Consequences and mitigation
-
Contact details and update plan
Appendix D — Individual Notification Template (if required)
-
What happened (plain English)
-
What data was involved
-
What we are doing
-
What you should do (passwords, vigilance, fraud alerts)
-
Support contact and ICO right to complain
17. Review and Approval
-
Owner: Data Protection Lead / Information Security Lead
-
Review frequency: annually and after any SEV1/SEV2 incident
-
Approval: Board/Directors of each Company (or delegated authority)
-
Modern Slavery & Human Trafficking Statement
Last updated: 12 February 2026
1. Introduction
ProcurePublic Limited (“ProcurePublic”, “we”, “us”, “our”) is committed to preventing modern slavery, servitude, forced or compulsory labour, and human trafficking in our business operations and supply chains. This statement is made pursuant to section 54 of the Modern Slavery Act 2015 (where applicable) and/or published voluntarily to demonstrate our zero-tolerance approach.2. Our business and what we do
ProcurePublic acts as a managing agent supporting UK public sector contracting authorities to establish and operate compliant procurement solutions (including frameworks and other collaborative arrangements) and to facilitate call-off contracting with pre-qualified suppliers.
Our services typically include: procurement project management, market engagement support, supplier onboarding and assurance, governance and compliance administration, and framework management support.-
Registered office: [insert address]
-
Company number: [insert number]
-
Website: [insert URL]
3. Our supply chains
Our primary supply chains are predominantly UK-based and are linked to the delivery of goods, works and services procured via public sector frameworks and call-off contracts administered by, or supported through, our framework activity. These commonly include (non-exhaustively): facilities management, building works, compliance services, professional services, and specialist maintenance services.
ProcurePublic may also procure its own operational suppliers (e.g., professional advisers, IT, marketing, and office services).4. Policies and governance
We operate policies and procedures intended to reduce the risk of modern slavery and human trafficking, including:-
Anti-slavery commitment: zero tolerance of modern slavery and human trafficking.
-
Supplier standards: expectations of ethical employment practices, legal compliance, and responsible sourcing.
-
Whistleblowing / reporting: a route for staff and stakeholders to report concerns confidentially.
-
Safeguarding and complaints approaches: clear escalation where risks relate to vulnerable individuals or service users.
-
Procurement governance: documented evaluation and award processes, audit trail requirements, and contractual controls appropriate to public sector procurement.
5. Due diligence and supplier assurance (our managing agent role)
As a managing agent, we apply proportionate due diligence within the procurement process and through framework management activity. This may include:-
Pre-qualification / selection checks proportionate to the category and risk (e.g., corporate compliance declarations, relevant policies, right-to-work approaches, and supply chain controls).
-
Contractual requirements to comply with all applicable laws (including the Modern Slavery Act 2015) and to maintain appropriate policies and controls.
-
Supplier self-certification that modern slavery is not present in their operations or supply chains and that they will notify us and the contracting authority of any material issues.
-
Audit and monitoring rights where appropriate (including requesting evidence, conducting reviews, and escalating issues to the relevant contracting authority).
-
Remediation and escalation: where concerns are identified, we will work with the contracting authority and supplier to seek prompt corrective action and may apply sanctions up to and including suspension/termination from the framework (subject to contract and procurement law).
6. Risk assessment and risk management
We recognise that modern slavery risks can vary by sector, geography, workforce model, and subcontracting arrangements. In the context of public sector procurement, higher-risk indicators can include:-
labour-intensive service models (e.g., cleaning, security, certain construction trades);
-
heavy reliance on agency labour or subcontracting;
-
unusually low pricing that may indicate labour exploitation risks; and
-
insufficient supply chain transparency.
We manage risk by applying proportionate checks at procurement stage, ensuring contractual controls are in place, and monitoring supplier performance and compliance during the framework term.
7. Training and awareness
We aim to ensure staff involved in procurement and framework management understand modern slavery risks and how to respond. Our approach includes:-
induction and refresher briefings for relevant staff;
-
guidance on risk indicators (pricing anomalies, labour model concerns, subcontracting opacity); and
-
escalation routes and record-keeping expectations.
8. Reporting concerns
Anyone who has a concern relating to modern slavery in connection with ProcurePublic, our suppliers, or framework activity should report it via:-
Email: [insert compliance/support email]
-
Postal address: [insert address]
We will assess reports promptly and escalate to the relevant contracting authority and/or appropriate agencies where necessary.
9. Effectiveness and continuous improvement
We keep our approach under review and may measure effectiveness through indicators such as: supplier declaration completion rates, compliance reviews completed, issues raised and resolved, and staff training completion/refresh cycles.10. Approval
This statement was approved by the Board of ProcurePublic Limited on [DD Month YYYY] and will be reviewed annually.-
Equality, Diversity & Inclusion (EDI) Policy
Applies to: ProcurePublic Limited and National Framework Partnership Limited (together, “the Managing Agent”)
Document owner: Managing Director / Board
Version: 1.0
Last updated: 12 February 2026
Review cycle: Annual (or sooner following legal/regulatory change or a material incident)
1. Policy statement
We are committed to equality, diversity and inclusion in everything we do—internally as employers and externally in the way we design, manage and support public sector procurement activity as a managing agent.
We will:
-
Treat people with dignity and respect, and promote an inclusive culture where everyone can contribute.
-
Prevent unlawful discrimination, harassment, victimisation and unfair treatment.
-
Ensure our procurement processes, communications and decisions are fair, transparent, objective and evidence-based.
-
Support contracting authorities to deliver procurement outcomes that are accessible, inclusive and consistent with applicable procurement and equality law.
This policy is supported by related procedures (e.g., recruitment, grievance, whistleblowing, complaints, data protection, conflicts of interest, and supplier conduct/ethics expectations).
2. Purpose
This policy sets out how we:
-
Meet our legal obligations under equality legislation and employment law.
-
Embed EDI into procurement support services, including pre-market engagement, tender design, evaluation support, and supplier management/communications.
-
Provide a clear route to raise concerns and ensure they are handled fairly and promptly.
3. Scope
This policy applies to:
-
All employees, directors, agency workers, contractors, consultants and anyone working on our behalf.
-
All activities undertaken as a managing agent for public sector procurement (e.g., framework/DPS establishment, call-off support, supplier onboarding, communications, events, stakeholder engagement).
-
Third parties we engage (where relevant) and the standards we expect from suppliers interacting with our processes.
4. Definitions
-
Equality: Fair treatment and equal opportunity; removing barriers and disadvantages.
-
Diversity: Recognising, respecting and valuing differences and varied experiences.
-
Inclusion: Creating an environment where people feel welcome, respected and able to participate fully.
-
Protected characteristics (Equality Act 2010): Age, disability, gender reassignment, marriage/civil partnership (employment only), pregnancy/maternity, race, religion/belief, sex, sexual orientation.
-
Reasonable adjustments: Changes to remove disadvantage for disabled people (e.g., accessible formats, extra time, alternative channels).
5. Legal and regulatory context (UK)
We will act consistently with:
-
Equality Act 2010 (including duties to prevent discrimination and provide reasonable adjustments).
-
Relevant employment law and guidance.
-
Applicable public procurement law and principles (including non-discrimination, equal treatment, transparency and proportionality).
-
Where we support contracting authorities, we will also help them meet applicable equality duties and good practice (e.g., accessibility, inclusive engagement, and appropriate consideration of social value where relevant).
6. Our EDI commitments
6.1 Culture and behaviour
We expect all colleagues and representatives to:
-
Treat others respectfully and professionally.
-
Challenge inappropriate behaviour and escalate concerns.
-
Avoid assumptions, stereotyping or exclusionary conduct.
6.2 Zero tolerance
We do not tolerate:
-
Discrimination (direct or indirect)
-
Harassment or bullying
-
Victimisation of anyone raising a concern in good faith
7. Roles and responsibilities
7.1 Board / Senior Leadership
-
Set the tone and provide oversight of EDI performance and compliance.
-
Ensure resources are available for training, accessibility and fair process design.
-
Review EDI risks and approve improvements.
7.2 Managers
-
Apply this policy consistently in recruitment, supervision, performance and conduct matters.
-
Ensure team members understand EDI expectations and complete training.
-
Escalate concerns promptly and maintain confidentiality.
7.3 All colleagues and representatives
-
Follow this policy and complete required training.
-
Raise concerns promptly via the routes in Section 14.
-
Cooperate with investigations and maintain confidentiality.
7.4 Procurement support leads (project/tender leads)
-
Embed EDI and accessibility into procurement materials and stakeholder engagement.
-
Ensure evaluation support is objective and evidence-based, with appropriate records.
8. Recruitment, employment and development
We will:
-
Use fair, consistent recruitment processes with role-relevant criteria.
-
Make reasonable adjustments for candidates and employees.
-
Provide equal access to training, development and progression.
-
Address inappropriate conduct through fair processes.
-
Monitor (where appropriate and lawful) workforce diversity and inclusion indicators to identify improvement areas.
9. EDI in procurement delivery (managing agent activities)
When supporting contracting authorities, we will promote fair and inclusive procurement by applying the following controls and practices.
9.1 Fair access and supplier engagement
We will:
-
Use clear, plain-English procurement communications wherever possible.
-
Provide information in accessible formats on request (e.g., large print, alternative file formats).
-
Use proportionate selection/participation criteria aligned to the requirement and lawful procurement principles.
-
Encourage broad market engagement that does not unfairly exclude SMEs/VCSEs or new entrants (where consistent with the authority’s strategy and legal framework).
-
Avoid unnecessary barriers (e.g., overly burdensome evidence requests) unless justified by risk and proportionality.
9.2 Tender documentation and specification design (supporting the authority)
We will help ensure:
-
Requirements are based on outcomes and service needs, not assumptions about who can deliver them.
-
Accessibility and inclusive service delivery requirements are considered where relevant (e.g., services to tenants/residents, public-facing communications, site access, appointments).
-
Equality-related risks are identified early (e.g., impacts on disabled users, language barriers, digital exclusion).
9.3 Evaluation support and decision integrity
We will:
-
Apply pre-published criteria consistently and not introduce new criteria after publication.
-
Use evaluation approaches that reduce bias (e.g., structured scoring guidance, moderation notes, separation of conflicts).
-
Maintain auditable records of decisions, clarifications and moderation.
-
Ensure any social value or EDI-related criteria (if used by the authority) are relevant, proportionate and measurable.
9.4 Clarifications and bidder support
We will:
-
Treat all bidders consistently and share clarifications fairly in line with the published process.
-
Provide reasonable adjustments for bidders who require them (e.g., extra time to attend a clarification meeting, accessible documentation), where lawful and consistent with equal treatment.
9.5 Communications, events and meetings
We will:
-
Offer accessible meeting options (e.g., Teams/telephone) where appropriate.
-
Make reasonable adjustments for attendees (e.g., captions, accessible venues, agenda in advance).
-
Promote respectful conduct in all supplier briefings and stakeholder events.
9.6 Supplier behaviour and standards
We expect suppliers interacting with our processes to:
-
Comply with equality law and not discriminate or harass.
-
Treat our staff and stakeholders respectfully.
-
Cooperate with reasonable accessibility requests.
Serious concerns may be escalated to the contracting authority and, where appropriate, may affect participation subject to the authority’s governance and legal framework.
10. Reasonable adjustments and accessibility
We will provide reasonable adjustments for employees, candidates, stakeholders and suppliers where requested and appropriate. Examples include:
-
Alternative document formats (editable Word, tagged PDF, large print)
-
Captioning/recorded summaries where appropriate
-
Additional time for responses where lawful and consistent with equal treatment
-
Alternative communication channels (phone/video/email)
Requests should be made to the project lead or HR/Operations contact. We will respond promptly and keep a record of adjustments agreed.
11. Training and awareness
We will:
-
Provide EDI awareness training to relevant staff, refreshed periodically.
-
Provide role-specific guidance for procurement staff on avoiding bias and ensuring inclusive procurement communications.
-
Maintain training records and address non-completion where required.
12. Monitoring, data and reporting
We will monitor EDI performance proportionately and lawfully, which may include:
-
Workforce metrics (where collected and with appropriate privacy safeguards).
-
Procurement delivery indicators (e.g., accessibility requests received and responded to; supplier engagement feedback; complaint themes).
-
Lessons learned after procurements or incidents.
All personal data will be handled in accordance with data protection law and our privacy policies.
13. Third parties, partnerships and managing agent role
Where we work as a managing agent for contracting authorities, we will:
-
Align our delivery to the authority’s governance, procurement rules and equality commitments.
-
Flag equality and accessibility risks promptly and propose mitigations.
-
Keep clear audit trails of key decisions and communications within our scope.
Where we subcontract any part of our services, we will communicate EDI expectations and address any concerns promptly.
14. Raising concerns and complaints
Anyone can raise an EDI-related concern, including staff, suppliers and stakeholders.
14.1 How to raise a concern
Concerns may be raised via:
-
Line manager or project lead
-
HR/Operations contact
-
Whistleblowing route (where appropriate)
-
Formal complaint channel [insert email/portal]
We encourage early reporting. Reports can be made confidentially. Anonymous reports will be considered, though they may limit our ability to investigate.
14.2 What happens next
We will:
-
Acknowledge receipt promptly.
-
Assess risk and decide the appropriate route (informal resolution, formal investigation, referral to contracting authority where relevant).
-
Investigate fairly, maintain confidentiality, keep records, and communicate outcomes where appropriate.
-
Take action if concerns are upheld (training, process changes, disciplinary steps, or escalation).
14.3 No retaliation
We will not tolerate retaliation against anyone raising a concern in good faith. Any victimisation will be treated as a serious matter.
15. Breaches of this policy
Breaches by employees or representatives may lead to disciplinary action (up to and including dismissal).
Breaches by contractors/third parties may lead to termination of engagement and escalation to relevant contracting authorities where appropriate.
16. Review and continuous improvement
This policy will be reviewed at least annually, and additionally:
-
Following legal/regulatory changes
-
Following a serious incident or upheld complaint
-
Where monitoring indicates a material improvement need
-
Environmental & Sustainability Policy
Document control
-
Owner: Managing Director / Responsible Officer for Sustainability
-
Approved by: Board / Senior Leadership Team
-
Version: 1.0
-
Last updated: 12 February 2026
-
Review frequency: Annual (or sooner if legislation / sector requirements change)
1. Policy statement
ProcurePublic Limited (“PP”) and National Framework Partnership Limited (“NFP”) (together, “the Companies”) are committed to reducing environmental impacts and supporting sustainable outcomes across the public sector procurement activities we manage.
As a managing agent and framework provider, our primary influence is through:
-
how we design and run procurements and framework arrangements,
-
the requirements we place on suppliers,
-
the way we evaluate bids and manage contract performance,
-
and how we operate our own business.
We will integrate environmental considerations into our governance, procurement processes, supplier engagement, and internal operations, striving for continual improvement and measurable progress.
2. Scope
This policy applies to:
-
All employees, directors, contractors, and temporary staff working for or on behalf of PP and NFP;
-
All procurement activities we manage, including frameworks, dynamic purchasing systems, mini-competitions, and call-off support;
-
Our own office, travel, IT, and administrative operations;
-
Supplier management activities, including onboarding, contract management, and performance monitoring where applicable.
3. Our sustainability principles
We will apply the following principles across our operations and procurement services:
-
Compliance first – meet or exceed applicable environmental laws and public-sector requirements.
-
Prevention and reduction – prioritise reducing emissions, waste, pollution, and resource use before offsetting.
-
Whole-life thinking – consider whole-life cost and environmental impacts, not just purchase price.
-
Transparency – collect and report relevant sustainability data responsibly and proportionately.
-
Continuous improvement – set targets, monitor progress, and improve year-on-year.
-
Collaboration – work with contracting authorities and suppliers to identify practical improvements.
4. Responsibilities and governance
4.1 Board / Senior Leadership Team
-
Approves this policy and ensures sufficient resources to implement it.
-
Reviews performance annually and agrees improvement actions.
4.2 Responsible Officer for Sustainability (named role)
-
Oversees implementation across both Companies.
-
Maintains the Sustainability Action Plan, targets, and reporting.
-
Provides advice to procurement teams on sustainable procurement and evaluation.
4.3 Procurement / Operations Teams
-
Embed environmental considerations into procurement documents, evaluation criteria, and supplier engagement.
-
Encourage realistic, evidence-based supplier commitments and proportionate reporting.
4.4 All staff and representatives
-
Follow this policy and contribute to reducing environmental impacts (e.g., travel choices, printing, energy use).
5. Sustainable procurement commitments (managing agent role)
When acting on behalf of contracting authorities, we will support sustainable procurement by implementing the measures below where relevant and proportionate to the scope and risk of the requirement.
5.1 Procurement planning and strategy
We will:
-
Encourage early consideration of sustainability objectives with the client/authority (e.g., carbon, waste, circular economy, biodiversity, water, local environmental impacts).
-
Identify category-specific environmental risks and opportunities during market engagement.
-
Promote specifications that support low-carbon delivery and resource efficiency.
5.2 Specification and tender requirements
We will, where appropriate:
-
Encourage low-carbon and resource-efficient solutions (e.g., energy-efficient plant/equipment, low-emission vehicles, reduced packaging).
-
Require suppliers to evidence relevant environmental management controls proportionate to contract scope (e.g., policies, procedures, training, audits, certifications where held).
-
Include expectations for legal compliance, pollution prevention, waste management, and responsible materials sourcing.
5.3 Evaluation and award
We will support contracting authorities to:
-
Include environmental / sustainability criteria within quality scoring where suitable (e.g., carbon reduction method statements, waste minimisation, sustainable materials, logistics optimisation).
-
Ensure evaluation is evidence-based (plans, data, accreditations, sample reporting templates) and avoids vague or unenforceable commitments.
-
Use a whole-life cost approach where relevant, particularly for asset-heavy and energy-using categories.
5.4 Contract and supplier management (where we provide support)
We will encourage:
-
Contract clauses and KPIs that monitor sustainability outcomes (e.g., carbon reporting, waste diversion, reuse, recycled content, fuel use, site controls).
-
Continuous improvement commitments and periodic performance reviews.
-
Practical reporting that is proportionate and aligned to contract size and risk.
5.5 Market engagement and supplier development
We will:
-
Communicate sustainability expectations clearly during pre-procurement engagement and supplier onboarding.
-
Encourage innovation (e.g., new low-carbon methods, digital reporting, circular models).
-
Aim to remove unnecessary barriers while maintaining strong environmental outcomes.
6. Supplier standards and expectations
Suppliers participating in frameworks and procurement routes we manage may be required (as appropriate) to:
-
Comply with environmental legislation and hold relevant permits/authorisations;
-
Maintain an environmental policy and operational controls appropriate to their activities;
-
Train staff on environmental responsibilities relevant to delivery;
-
Manage waste in line with the waste hierarchy (prevent, reduce, reuse, recycle, recovery, disposal);
-
Demonstrate safe storage and handling of hazardous substances (where applicable);
-
Reduce transport impacts (route optimisation, consolidation, low-emission fleets where feasible);
-
Provide environmental performance information when requested and proportionate.
We will promote fair, proportionate requirements and support clients to avoid “tick-box” obligations that do not drive real outcomes.
7. Our internal environmental management (PP and NFP operations)
Even where our direct operational footprint is relatively small, we will reduce environmental impacts through practical measures:
7.1 Energy and premises
-
Use energy-efficient settings for IT equipment and lighting.
-
Prefer suppliers/landlords with credible energy-efficiency and sustainability practices where we can influence choices.
7.2 Travel and meetings
-
Use remote meetings by default where effective.
-
Reduce business travel and choose lower-carbon travel options where practical.
-
Monitor business travel and promote sensible alternatives.
7.3 Paper, printing and digital-first
-
Adopt digital-by-default workflows, e-signatures, and electronic document management.
-
Print only when necessary; use duplex printing and recycled paper.
7.4 Waste and recycling
-
Recycle office waste where facilities exist.
-
Reduce single-use items and unnecessary packaging.
7.5 IT and procurement of goods/services
-
Consider lifecycle impacts when purchasing equipment (durability, repairability, energy efficiency, take-back schemes).
-
Extend device life where feasible and dispose of e-waste responsibly using accredited providers.
8. Carbon and environmental impact measurement
We will take a proportionate approach to measurement and improvement, which may include:
-
Tracking key operational metrics (e.g., business travel, electricity where available, paper use).
-
Encouraging clients and suppliers to measure and report carbon impacts for relevant categories (e.g., construction, facilities management, maintenance).
-
Maintaining an annual Sustainability Statement summarising actions taken, progress, and improvement plans.
Where clients require specific reporting formats (e.g., carbon reduction plans or environmental KPIs), we will align our procurement approach to support those requirements.
9. Objectives and continual improvement
The Companies will maintain a Sustainability Action Plan with objectives such as:
-
Increasing the consistent inclusion of proportionate sustainability criteria in relevant procurements;
-
Improving supplier engagement on practical carbon and waste reduction;
-
Reducing internal environmental impacts through digital-first and lower-travel approaches;
-
Enhancing data collection and reporting year-on-year.
Targets will be set and reviewed annually, taking account of:
-
our operating model and proportionality,
-
client requirements,
-
category risk and impact,
-
and practical deliverability for suppliers.
10. Training and awareness
We will:
-
Provide appropriate guidance/training for staff involved in procurement on sustainable procurement practices and evaluating environmental commitments.
-
Share good practice templates (method statements, KPI examples, reporting schedules) where helpful.
11. Communication and publication
This policy will be:
-
Communicated to staff and relevant representatives,
-
Made available to clients and suppliers upon request (and published on our websites where appropriate),
-
Supported by periodic updates on progress and improvements.
12. Non-compliance and corrective action
Where we identify non-compliance with this policy in our operations or material environmental non-compliance in supplier performance (where within our remit), we will:
-
record the issue,
-
agree corrective actions and timescales,
-
escalate to the relevant authority/client where appropriate,
-
and monitor completion.
13. Review
This policy will be reviewed:
-
at least annually, and
-
earlier if there are material changes to relevant regulation, public-sector requirements, or the Companies’ operating model.
-
Cyber Security Policy
Cyber Security Policy
Last updated: 12 February 2026
1. Purpose
This policy sets out the minimum cyber security requirements for Suppliers appointed to any ProcurePublic Limited framework (the “Framework”). It is intended to protect ProcurePublic Limited, its contracting authorities/clients, residents/service users, and Supplier systems and data from cyber threats, and to support safe, resilient service delivery.
2. Scope
This policy applies to all appointed Suppliers and their sub-contractors where they:
-
process, store, transmit, or access ProcurePublic Limited or Client information (including personal data), or
-
connect to or interact with Client systems, networks, sites, devices, or digital services, or
-
deliver services that rely on IT/OT/IoT (e.g., building systems, lift monitoring, access control, CCTV, alarms, asset systems, portals, mobile apps).
3. Definitions
-
Client: any contracting authority or public-sector body using the Framework.
-
Information: any data relating to ProcurePublic Limited, a Client, residents, employees, assets, sites, or operations (including metadata).
-
Personal Data: as defined in UK GDPR and the Data Protection Act 2018.
-
Security Incident: an event that compromises (or risks compromising) confidentiality, integrity, or availability of systems or information (includes suspected incidents).
4. Policy statement
Suppliers must maintain appropriate technical and organisational measures proportionate to the services provided, the risk profile, and the sensitivity of information handled. Suppliers must be able to demonstrate compliance on request.
5. Minimum security controls (baseline)
Suppliers must implement and maintain the following minimum controls:
5.1 Governance and accountability
-
A named senior owner for information/cyber security (e.g., Director, Head of IT, CISO equivalent).
-
Documented security policies and procedures reviewed at least annually.
-
A maintained asset inventory covering devices, systems, applications, and cloud services used to deliver services under the Framework.
5.2 Risk management
-
A documented risk assessment approach for cyber risks relevant to services delivered.
-
Risk assessments for any new technology/service that will handle Client data or connect to Client environments.
5.3 Access control and identity
-
Multi-Factor Authentication (MFA) for remote access, privileged/admin accounts, and all cloud email accounts.
-
Unique user accounts (no shared logins where practicable); strong password policy and account lockout.
-
Least privilege access; privileged access reviewed at least quarterly.
-
Joiner/mover/leaver process with access removal promptly on role change/termination.
5.4 Device and endpoint security
-
Supported operating systems and software only; security patches applied in a timely manner.
-
Anti-malware / endpoint detection controls appropriate to the environment.
-
Full disk encryption for laptops and portable devices used for Framework services.
-
Mobile devices protected via PIN/biometrics; ability to remotely wipe where feasible.
5.5 Vulnerability and patch management
-
Routine patching for operating systems, applications, firmware, and network devices.
-
Regular vulnerability scanning (internal and/or external as appropriate).
-
Critical vulnerabilities prioritised and remediated within a defined timeframe based on risk.
5.6 Network and communications security
-
Secure remote access (VPN or equivalent secure method) where required.
-
Segmentation and secure configuration of networks that host service systems.
-
Encryption in transit (e.g., TLS) for web services and data transfer where feasible.
-
No insecure protocols for management interfaces (avoid Telnet/FTP; use SSH/SFTP, etc.).
5.7 Data protection and handling
-
Data minimisation: only collect/process what is necessary for the service.
-
Encrypt sensitive data at rest where feasible and proportionate.
-
Secure disposal of data and media (including paper records).
-
Clear data retention periods aligned to contract and legal requirements.
-
No transferring Client data outside the UK unless explicitly permitted by the Client and lawful safeguards are in place.
5.8 Backups and resilience
-
Backups for business-critical systems supporting Framework services.
-
Backups protected from ransomware (e.g., offline/immutable where feasible).
-
Periodic restore tests to validate recovery.
5.9 Logging, monitoring, and detection
-
Security event logging for key systems (including admin actions and access to sensitive data).
-
Monitoring appropriate to the size/risk of the organisation, with defined escalation routes.
5.10 Secure development and change control (where applicable)
If the Supplier develops or configures software/portals/integrations:
-
Secure development practices (e.g., code review, dependency management, vulnerability remediation).
-
Change control including testing and rollback planning.
-
Separation of environments (dev/test/prod) where feasible.
5.11 Physical security
-
Reasonable physical security for offices and any locations where Client information is stored/processed.
-
Controlled access to server rooms, comms cabinets, and sensitive areas.
5.12 Supply chain security
-
Suppliers must ensure sub-contractors comply with equivalent controls.
-
Due diligence on any third parties processing Client information.
-
Written agreements with sub-contractors including security and incident obligations.
6. Incident management and reporting
Suppliers must have an incident response process that includes identification, containment, eradication, recovery, and lessons learned.
Mandatory notification:
-
Suppliers must notify ProcurePublic Limited and the affected Client without undue delay and no later than 24 hours after becoming aware of any Security Incident that:
-
affects (or may affect) Client systems/services,
-
involves Client information, or
-
could materially impact service delivery under the Framework.
-
Incident notification must include (as available at the time):
-
summary of what happened and when,
-
systems/services affected,
-
type of data involved (incl. whether personal data is impacted),
-
containment actions taken,
-
immediate risks and mitigation steps,
-
proposed next steps and timelines,
-
a point of contact responsible for incident handling.
Where personal data is involved, Suppliers must cooperate fully with Client and ProcurePublic Limited to support UK GDPR obligations (including ICO/resident notifications where required by the Client).
7. Assurance, audit, and evidence
On request (including as part of tender, mobilisation, or contract management), Suppliers must be able to provide reasonable evidence of compliance, such as:
-
Cyber Essentials / Cyber Essentials Plus certificate (where held),
-
ISO/IEC 27001 certificate (where held),
-
security policies (access control, incident response, backup, patching),
-
penetration test/vulnerability scan summaries (redacted as necessary),
-
staff training records,
-
business continuity and disaster recovery arrangements.
ProcurePublic Limited and/or Clients may request additional proportionate assurance where services are high risk (e.g., processing special category data, large volumes of resident data, or integration into Client networks).
8. Training and awareness
Suppliers must ensure staff involved in delivering Framework services receive:
-
security awareness training at induction and at least annually,
-
phishing/social engineering awareness,
-
role-based training for privileged users and those handling sensitive data.
9. Acceptable use and confidentiality
Supplier personnel must:
-
follow Client site rules and IT/security policies when on Client premises or using Client systems,
-
keep Client information confidential and share only with authorised persons,
-
report suspected security weaknesses or incidents immediately via Supplier internal processes and the notification route in section 6.
10. Non-compliance
Failure to comply with this policy may result in proportionate actions, which can include:
-
corrective action plan with deadlines,
-
additional assurance requirements,
-
suspension from receiving opportunities under the Framework,
-
termination remedies as provided in the Framework Agreement and/or Call-Off contract.
11. Policy ownership and review
This policy is issued by ProcurePublic Limited and may be updated periodically to reflect evolving threats, regulatory guidance, and Client requirements. Suppliers must ensure continued compliance with the latest published version for the duration of their appointment.
-
